Regional Transportation Plan
Bicycle Plan Update
Road/Water Quality
Studies
Related Documents
Federal Transportation Improvement Program
Regional Surface Transportation Program
Congestion Mitigation & Air Quality
Related Documents
Bicycle and Pedestrian Plan
Projects Underway
Bike to Work Week
Bike Trail Maps
Bike Related Documents
Bike Trail Model
Social Service Transportation
Advisory Council
Transportation Development Act
Taking Transit in Tahoe
BlueCommute
BlueGO
Tahoe Area Regional Transit
Tahoe Transportation District
Related Documents
Disadvantaged Business Enterprise
Contact Us
Admin
California Roads
Nevada Roads
2011 Construction Map
Tahoe Traffic Cams
Bicycle and Pedestrian Planning
Bicycle and Pedestrian Master Plan -- Amended October 2006
Table of Contents
I. Introduction
II. Benchmarks
III. Bicycles
IV. Pedestrians
V. Existing Conditions
VI. Analysis of Demand
VII. Proposed System
VIII. Cost and Funding Analysis
IX. Implementation
X. Maintenance
Appendix A. Figures 1-12 (includes maps)
Appendix B. Conceptual Cost Estimates for Individual Routes
Appendix C. Funding Source Description
Appendix D. Bibliography
Appendix E. TRPA Initial Environmental Checklist
Appendix F. Master Comment List
SR-89 Cascade to Rubicon Bay Bikeway Study
Cover
Table of Contents
I. Introduction
II. Existing Conditions
III. Conceptual Alternatives
IV. Preferred Bikeway Concepts
V. Design Guidelines
VI. Phasing and Implementation
VII. Preparers and TAC Members
VIII. Appendix Photo Library
Environmental, Economic, and Public Health Impacts of Shared Use Paths in Lake Tahoe
More Bicycle and Pedestrian Documents on the TIIMS website
Regional Planning
ADA Paratransit Plan(15mb)
BlueGO Triennial Performance Audit Ending June 30, 2006
Climate Action Database Guidance Memo
Coordinated Public Transit Human Services Transportation Plan (CHSP)
Interregional/Intraregional Transit Study for the Tahoe Basin
Lake Tahoe Transportation Overall Work Program 2009-2010
Mobility 2030 -- Lake Tahoe Regional Transportation Plan (RTP)
North Tahoe Truckee Employer Commute Survey 2002
2008 / 2009 Overall Work Program (OWP).
Amendment #1 to the 2008-2009 Lake Tahoe Transportation Overall Work Program (OWP)
Plan de Participación del Público 2008
Public Participation Plan 2008
Tahoe Area Regional Transit Systems Plan Study Executive Summary
TART Systems Plan Chapter 9
TART Triennial Performance Audit Ending June 30, 2006
TRPA Performance Audit – Ending June 30, 2007
Unmet Transit Needs Determination 2007-2008
US Highway 50/Stateline Study
Transportation Funding
2008 Federal Transportation Improvement Program (2008 FTIP)
Transportation Studies
Waterborne Transit Site Selection Study
Intro and Appendix A (29.2 MB)
Appendix B (861 KB)
Tahoe City (4.5 MB)
Kings Beach (7.6 MB)
Ski Run (4.2 MB)
Lakeside Marina (6.7 MB)
Market Potential (58 KB)